Wood Wharf E14

Main Contractor: Canary Wharf Contractors

Client: Borough Engineering Services

Start Date: December 2022

Duration: 4 Months

Value: TBC

Scope: Design, fabricate and install CHW/LTHW infrastructure pipework to primary side of 2 x PHE.

Method: Welded and Screwed BSP

Southbank Place SE1

Main Contractor: Canary Wharf Contractors

Client: Borough Engineering Services

Start Date: January 2022

Duration: 12 Months

Value: £500,000.00

Scope: Low Pressure 8” Gas main inside 12” Sleeve through the basement to feed 8 x boilers.

Method: Carbon Steel fully welded pipe in pipe, Flanged and Screwed BSP.

Birkbeck University WC1E

Main Contractor: ITC

Client: Holmes Technical Services Ltd

Start Date: May 2021

Duration: 8 Months

Value: £155,000.00

Scope: Basement Plantroom, Level 7 Plantroom and Corridor Distribution.

Method: Welded, Victaulic, Screwed BSP and Soldered Copper

Kidbrooke Village Block E

Main Contractor: Berkeley Homes

Client: Briar Mechanical

Start Date: July 2021 – JUNE 2022

Duration: 11 Months

Value: £575,000.00

Scope: Shell & Core pipework in basement/risers and corridor distribution. Labour Only

Method: Welded, Screwed BSP, Brazed and Soldered Copper

Woolwich Riverside Phase 10

Main Contractor: Berkeley Homes

Client: Briar Mechanical

Start Date: July 2022 – March 2023

Duration: 9 Months

Value: £355,000.00

Scope: Shell & Core pipework in risers and corridor distribution. Labour Only

Method: Welded, Screwed BSP, Brazed and Soldered Copper

FUTURE SECURED WORK
Project: Kidbrooke Village Block J

Main Contractor: Berkeley Homes

Client: Briar Mechanical

Start Date: April 2023

Duration: Programme to be confirmed

Value: £375,000.00

Scope: Shell & Core pipework in basement/risers and corridor distribution.

Method: Welded, Screwed BSP, Brazed and Soldered Copper

Previous work
Corridor distribution pipework and riser valve sets “The Stage” Curtain Road, London.
The Stage.jpg
Utility module remedials, meter installation and testing works “One Crown Place”
One Crown Place.jpg
Pod testing and remedial works "Greenwich Village"
Greenwich Square.jpg
Riser modifications and aftercare works "Southbank"
Southbank.jpg
Utility module remedials "Ecoworld Barking"
Ecoworld.jpg
General plumbing works "Damac Tower"
Damac Tower.jpg
Plantroom pipework installation "NO6 Stratford"
NO6.jpg
Ecoworld Barking 1

Ecoworld Barking 1

Ecoworld Barking 1

Ecoworld Barking 2

Ecoworld Barking 2

Ecoworld Barking 2

Prefab1

Prefab1

Prefab1

Prefab2

Prefab2

Prefab2

The Stage corridor distribution 1

The Stage corridor distribution 1

Shoreditch - The Stage building - corridor distribution 1

The Stage corridor distribution 2

The Stage corridor distribution 2

Shoreditch - The Stage building - corridor distribution 2