Wood Wharf E14
Main Contractor: Canary Wharf Contractors
Client: Borough Engineering Services
Start Date: December 2022
Duration: 4 Months
Value: TBC
Scope: Design, fabricate and install CHW/LTHW infrastructure pipework to primary side of 2 x PHE.
Method: Welded and Screwed BSP








Southbank Place SE1
Main Contractor: Canary Wharf Contractors
Client: Borough Engineering Services
Start Date: January 2022
Duration: 12 Months
Value: £500,000.00
Scope: Low Pressure 8” Gas main inside 12” Sleeve through the basement to feed 8 x boilers.
Method: Carbon Steel fully welded pipe in pipe, Flanged and Screwed BSP.









Birkbeck University WC1E
Main Contractor: ITC
Client: Holmes Technical Services Ltd
Start Date: May 2021
Duration: 8 Months
Value: £155,000.00
Scope: Basement Plantroom, Level 7 Plantroom and Corridor Distribution.
Method: Welded, Victaulic, Screwed BSP and Soldered Copper









Kidbrooke Village Block E
Main Contractor: Berkeley Homes
Client: Briar Mechanical
Start Date: July 2021 – JUNE 2022
Duration: 11 Months
Value: £575,000.00
Scope: Shell & Core pipework in basement/risers and corridor distribution. Labour Only
Method: Welded, Screwed BSP, Brazed and Soldered Copper







Woolwich Riverside Phase 10
Main Contractor: Berkeley Homes
Client: Briar Mechanical
Start Date: July 2022 – March 2023
Duration: 9 Months
Value: £355,000.00
Scope: Shell & Core pipework in risers and corridor distribution. Labour Only
Method: Welded, Screwed BSP, Brazed and Soldered Copper
FUTURE SECURED WORK
Project: Kidbrooke Village Block J
Main Contractor: Berkeley Homes
Client: Briar Mechanical
Start Date: April 2023
Duration: Programme to be confirmed
Value: £375,000.00
Scope: Shell & Core pipework in basement/risers and corridor distribution.
Method: Welded, Screwed BSP, Brazed and Soldered Copper
Previous work
Corridor distribution pipework and riser valve sets “The Stage” Curtain Road, London.

Utility module remedials, meter installation and testing works “One Crown Place”

Pod testing and remedial works "Greenwich Village"

Riser modifications and aftercare works "Southbank"

Utility module remedials "Ecoworld Barking"

General plumbing works "Damac Tower"

Plantroom pipework installation "NO6 Stratford"

![]() Ecoworld Barking 1Ecoworld Barking 1 | ![]() Ecoworld Barking 2Ecoworld Barking 2 | ![]() Prefab1Prefab1 |
---|---|---|
![]() Prefab2Prefab2 | ![]() The Stage corridor distribution 1Shoreditch - The Stage building - corridor distribution 1 | ![]() The Stage corridor distribution 2Shoreditch - The Stage building - corridor distribution 2 |